NuScale Won a Second NRC Design Approval in May 2025, and This Clip's "Only One Ever Certified" Line Leaves It Out

Watch on TikTok

View on TikTok ->

This is a 58-second vertical clip at 720x1280, posted 2026-09-24 by @betterwavefinance_ (channel name "BetterWave Finance"), carrying 183,200 views, 10,300 likes, 108 comments, 3,981 reposts and 8,779 saves at capture, scored to "Brick Ledge" by Marianne Harte. I read all 29 frames extracted at 2-second intervals plus five targeted frame grabs, against a 152-word Whisper transcript. The visuals are a hand-drawn whiteboard cartoon of a stick figure with a blue wave for a head, wearing a red tie, under a persistent "BW" watermark. The opening card reads "5 Nuclear Stocks That Can 10X in 2026" over a glowing atom. Later frames show a large orange "10X", a cooling tower wired to a microchip, a reactor drawing stamped "REACTOR OK" beside a black and orange checkmark, a domed government building labeled "NRC", a crossed-out smokestack factory next to a checkmarked orange box, a sheet of paper stamped "HALEU", an orange fuel rod glowing beside a plain white one, a turnstile with an orange arrow, and a five-card lineup at the end. The company cards each pair a logo with a ticker printed along the bottom edge: "OKLO" in orange under a grey ring logo, "SMR" under the NuScale N-logo, "NNE" under "NANO Nuclear Energy Inc.", "LEU" under the Centrus logo and its tagline "Fueling the Future of Nuclear Power", and "LTBR" in orange under "Lightbridge". No price, market cap, chart, percentage or dollar figure appears anywhere on screen.

All five tickers on the cards are correct

The clip prints a ticker on every company card, and each one matches the symbol the company files under. NuScale Power's Form 10-Q for the quarter ended 2026-06-30 carries Class A common stock under the symbol SMR on the New York Stock Exchange. Centrus Energy's Form 10-Q for the quarter ended 2026-06-30 carries LEU. Centrus moved that listing recently, ceasing trading on NYSE American after the close on 2025-12-03 and beginning NYSE trading on 2025-12-04, so any source still placing LEU on NYSE American is out of date. Lightbridge files its annual report as ltbr_10k.htm. Oklo and Nano Nuclear Energy trade under OKLO and NNE respectively, matching the cards at frames 4 and 13.

This matters because ticker errors are the most common failure in short-form stock content, and this creator avoided all five. The factual problems in the clip sit in the regulatory claims, not the symbols.

The NuScale claim is narrowly true and two years out of date

The audio says:

The first and only small modular reactor design ever certified by the NRC. Everyone else is still waiting in line behind them.

The first sentence survives a strict reading. The NRC certified the NuScale US600 standard design, twelve modules rated 160 MWt and 50 MWe each, through a final rule adding Appendix G to 10 CFR Part 52, published in the Federal Register on 2023-01-19. The NRC's own US600 design certification page documents it, and the agency described NuScale as the first SMR design it reviewed. No other SMR design has received a full design certification rule.

The clip stops there, and the more recent development cuts against its framing. On 2025-05-29 the NRC issued a standard design approval for the uprated NuScale US460, rated 250 MWt and 77 MWe per module. The NRC news release is dated 2025-05-29 under document number 25-033, the approval document is on the NRC docket as ML25129A004, and the Federal Register notice is dated 2025-06-04. A standard design approval is a different instrument from a design certification, and the US460 is the design NuScale carries forward. Reciting the 2023 certification alone describes the older, smaller design.

The second sentence fails outright. The clearest case is TerraPower. The NRC issued construction permit CPAR-1 for the Natrium reactor at Kemmerer, Wyoming, on 2026-03-09, after the Commission authorized issuance on 2026-03-04 through order CLI-26-5. NRC news release 26-028 describes it as the first construction approval for a commercial power reactor in roughly a decade and the first for a non-light-water commercial design in more than forty years. Kairos Power holds three permits: CPTR-6 for Hermes, issued 2023-12-14, and CPTR-7 and CPTR-8 for the two Hermes 2 reactors in Oak Ridge, Tennessee, issued 2024-11-21 under Commission order CLI-24-03. TVA's construction permit application for a GE Vernova Hitachi BWRX-300 at Clinch River is also further along than the clip allows, with the NRC completing its final safety evaluation on 2026-06-25 and holding the mandatory hearing on 2026-08-13, per the NRC advanced reactor highlights page.

NuScale holds no construction permit, no combined license and no operating license. Holding a certified design and holding a permit to pour concrete are separate positions in the queue, and at least two developers are ahead of NuScale on the second one. No SMR in the United States holds an operating license or a combined license as of 2026-09-26.

The Centrus HALEU claim survives only on a narrow definition of HALEU

The Whisper transcript renders this line as "The only U.S. company licensed to produce ISA low-enriched uranium." The on-screen prop resolves the word: frames 18 and 19 show the stick figure holding a sheet stamped "HALEU", high-assay low-enriched uranium.

One version of the claim checks out as of 2026-09-26. The NRC approved a license amendment allowing Centrus to produce HALEU at the Piketon, Ohio, American Centrifuge Plant, making Piketon the only US facility licensed to enrich uranium above 10 percent and up to 19.75 percent U-235, with an initial authorization of up to 600 kg. Centrus announced the start of enrichment operations on 2023-10-11, describing an initial 16-centrifuge cascade with capacity around 900 kilograms per year and calling itself "the only NRC-licensed HALEU facility in the United States and the first new U.S.-owned, U.S.-technology uranium enrichment plant to begin production since 1954."

Say "licensed to produce HALEU" instead of "licensed to enrich above 10 percent" and the claim stops holding, in three ways. HALEU is conventionally defined as uranium enriched above 5 percent and below 20 percent U-235. Urenco USA sits inside that band: the NRC approved amendment 105 to license SNM-2010 for the Eunice, New Mexico, plant on 2024-12-11, raising its limit from 5.5 percent to below 10 percent U-235, and Urenco USA says the NRC authorized it to operate at that level on 2025-09-30. Urenco brands the product LEU+ and argues HALEU begins at 10 percent, which is precisely the definitional gap the clip's wording hides.

Enrichment is also not the only route. BWXT's Nuclear Fuel Services site in Erwin, Tennessee, holds NRC Category I license SNM-124 and states that it downblends highly enriched uranium to produce both LEU and HALEU. That is licensed HALEU production with no enrichment involved. Separately, the NRC issued TRISO-X license SNM-7007 on 2026-02-13, the first Category II fuel fabrication license in roughly fifty years, authorizing possession of uranium enriched below 20 percent at Oak Ridge, per NRC news release 26-019. Most HALEU actually in developers' hands so far came from DOE stock downblended at Idaho National Laboratory, which is a DOE site operating outside NRC licensing entirely, and DOE has run three allocation rounds since 2025-04-09.

The word "only" has a visible shelf life. Global Laser Enrichment applied to build and operate the Paducah Laser Enrichment Facility in McCracken County, Kentucky, producing HALEU at assays up to roughly 20 percent using SILEX technology. The NRC accepted the application for review on 2025-08-04, announced a hearing opportunity in 2026, and published a draft environmental impact statement notice on 2026-03-27. NRC staff put the safety evaluation report at January 2027 and the final environmental impact statement at September 2026, and their preliminary recommendation is to issue the license absent safety issues. A viewer buying LEU on a monopoly thesis is buying a monopoly with a published end date under review.

Both transcription passes mangled "high-assay" and the drawing fixed it

The clip burns in word-by-word karaoke captions, which are generated from a separate pass than the Whisper transcript in this repository. They disagree in ways worth recording.

Whisper produced "Oklo." The burned-in caption at frame 4 reads "Oaklo," while the poster in the same frame reads "OKLO" correctly. Whisper produced "New Scale Power." The burned-in caption at 16.2s and 16.5s reads "New" then "scale" as two words, while the card shows the NuScale logo over the ticker "SMR". Whisper produced "Centris Energy." Here the burned-in caption is right: the grab at 33.2s reads "Centrus".

The worst case is the fuel term. Whisper produced "ISA low-enriched uranium." The burned-in captions run "Company", "to", "produce", "I", "A.", "Low", "enriched", "uranium," across 35.6s to 38.0s, so the creator's own caption pipeline also failed on the spoken phrase "high-assay." Neither text layer got it. The hand-drawn sheet stamped "HALEU" is the only element on screen that identifies the product correctly, which is a reminder that on financial clips the props sometimes carry more signal than the captions.

Three of the five companies have no licensed reactor and no fuel in a commercial core

The clip's own description ends with "Not financial advice, just what I'm watching," and the title card promises "5 Nuclear Stocks That Can 10X in 2026." Those two statements sit next to each other for a reason, and the development stage of three names is the reason.

Oklo holds no NRC license, and it is no longer primarily seeking one for Aurora. The NRC denied its original combined license application on 2022-01-06 without prejudice, citing insufficient information on accident analysis, safety classification and quality assurance. Oklo's Form 10-Q for the quarter ended 2026-06-30 states that for Aurora-INL the company is "pursuing DOE authorization as the primary pathway" and is still "evaluating the timing and form of future NRC applications." The word COLA does not appear in that filing. Oklo announced NRC approval of its Principal Design Criteria topical report in 2026, which is an input to a licensing review, not a license to operate.

The clip's "Backed by Sam Altman" is dated. Oklo announced on 2025-04-22 that Altman was stepping down as chairman, with co-founder and CEO Jake DeWitte taking the role, and the 8-K filed that day records that he resigned as a director as well. That filing states his decision "was not due to any disagreement with the Company." No Oklo filing gives a reason, so the widely repeated explanation that he left to clear an OpenAI conflict comes from press coverage rather than the company. His last disclosed position is a Schedule 13D/A filed 2025-04-04 reporting 6,650,402 shares, or 4.8 percent, down from 8.2 percent four months earlier. Falling below 5 percent and leaving the board ended his reporting obligation, so his current stake is not public.

Nano Nuclear's KRONOS microreactor is further along than its share of coverage suggests, with two caveats. The first is provenance: Nano Nuclear did not design KRONOS. It bought the design out of Ultra Safe Nuclear Corporation's Chapter 11 estate for $8.5 million in cash on 2025-01-10. The second is who is applying. The University of Illinois Urbana-Champaign submitted the construction permit application on 2026-03-31, the NRC accepted it on 2026-05-20, and the agency started formal review activities on 2026-06-23, per the NRC KRONOS project page and Nano Nuclear's release. The environmental assessment is expected in spring 2027 and the safety evaluation in early fall 2027, so nuclear construction cannot start before 2027 on the company's own estimate.

Lightbridge is the furthest from a commercial core, and its own Form 10-K for fiscal 2025 says so: the fuel design "remains in the research and development stage and will require extensive testing, regulatory review, and qualification before it can be commercially deployed," and "fabrication of full-length uranium-zirconium metallic fuel rods for large PWRs and BWRs has not been demonstrated." Its work runs through December 2022 umbrella agreements with Battelle Energy Alliance at Idaho National Laboratory. The first batch of Lightbridge Fuel material samples was removed from the Advanced Test Reactor and is cooling ahead of post-irradiation examination. The same 10-K adds the qualifier that matters: those coupons sit inside sealed irradiation capsules and are "not in direct contact with reactor coolant." They are unclad material samples, not fuel rods in service. The clip's phrasing, "packs more power into existing reactors without building anything new," describes a design intent for material that has not finished its first post-irradiation examination, from a company that has never submitted a licensing application to the NRC.

Key Takeaways

  • Every ticker printed on screen is correct: OKLO, SMR, NNE, LEU and LTBR all match the symbols under which those companies file with the SEC.
  • The NuScale claim is true only for the older US600 design certified by rule in January 2023. The NRC issued a standard design approval for the larger US460 on 2025-05-29, and the clip's script does not mention it.
  • "Everyone else is still waiting in line behind them" is wrong, and NuScale is the one in line. TerraPower holds construction permit CPAR-1 for Natrium, issued 2026-03-09, and Kairos Power holds three for Hermes and Hermes 2. NuScale holds no construction permit, no combined license and no operating license.
  • The Centrus claim depends entirely on how HALEU is defined. Piketon is the only US facility licensed to enrich above 10 percent U-235, which is the defensible version. It is not the only licensed producer of HALEU as the term is conventionally defined: Urenco USA is licensed to below 10 percent and authorized to operate there since 2025-09-30, and BWXT's Nuclear Fuel Services downblends HEU into HALEU under license SNM-124.
  • Even the narrow version has a published end date. Global Laser Enrichment's Paducah application has an NRC safety evaluation targeted for January 2027 and a preliminary staff recommendation to issue.
  • Whisper heard "ISA low-enriched uranium" and the creator's own burned-in captions rendered it "I A. Low enriched uranium." Both failed on the spoken phrase "high-assay." The hand-drawn sheet stamped "HALEU" is the only correct rendering on screen.
  • Oklo is not waiting on an NRC license for Aurora. Its original combined license application was denied on 2022-01-06, no replacement has been filed, and its 2026-06-30 10-Q names DOE authorization as the primary pathway instead.
  • Unverified: Sam Altman's current Oklo stake is not public, because his last disclosure was a 2025-04-04 Schedule 13D/A at 4.8 percent and dropping below 5 percent ended his reporting duty. I also could not confirm whether any specific Oklo data center supply contract has been signed as binding, the current tonnage of HALEU recovered from EBR-II fuel at Idaho National Laboratory, or any market capitalization, share price or return figure for the five names. The clip prints no financial figures, so there was nothing on screen to check, and I did not trace any price data to a dated source. The "10X in 2026" headline is a forecast and is not checkable.
  • The clip labels itself "Not financial advice, just what I'm watching" in its description. Nothing here is financial advice either.

Resources